To help provide an overview of renewable energy development in Perth and Kinross, we produce a series of maps based on our own database of renewable energy proposals.  

The maps showing biomass, hydro, solar and wind energy proposals is updated every  month.  However, it will not contain all renewable energy proposals, nor will it reflect recent changes in status.  Consequently, the map will never be 100% accurate. The maps are intended to provide an overview only.  The maps show proposals which have been approved, awaiting consent, refused and withdrawn.  We are working to resolve the problem. In the meantime if you use the links in the table below you will get information, including mapping, from our online database.

Once you have opened the map you should tick the box for the technology you are interested in.  You can then use your mouse to hover over a proposal and this allows you to query information using the map screen by clicking on the point you want to query. When you click on the proposal you are interested in a window will open with information about that proposal. Should you want more information you can use the planning application reference number to search our online database.  In addition more information about the larger proposals is shown below.

Wind energy

The table below shows the scale of the proposals operational, approved or in the planning system at 17 October 2014. You should be aware that as proposals develop, the size and status of proposals might change.  The list only covers wind turbines greater than 25 metres in height or more than 100kw in installed capacity.  You can also search the online database.

 

Application NumberLocation

Development

(Link to Online database)

Number of turbinesHeight to blade tip (m)Installed capacity (MW)Status
  Total Installed capacity  295+ 
Ref. No: 14/01686/SCRNSite At Hilton Of Duncrievie GlenfargProposed wind turbine134.2  
Ref. No: 14/01617/FLLEast Dron Wind Turbine Dron Bridge Of EarnErection of wind turbine and associated infrastructure1740.8Pending consideration
Ref. No: 14/01463/FLLLand 450 Metres North West Of East Blair Farm GlenfargErection of single wind turbine with associated works   Pending consideration
Ref. No: 14/01278/SCRNGlentarkie Farm Glentarkie Strathmiglo Cupar KY14 7RUErection of a wind turbine    
Ref. No: 14/01236/FLL240 Metres South West Of Scottish Off Road Driving Centre Glentarkie StrathmigloErection of wind turbine   Pending consideration
Ref. No: 14/01186/SCRNLand 400 Metres North West Of Hill House InchtureErection of a wind turbine    
Ref. No: 14/01168/SCRNLand 600 Metres North East Of Wester Bleaton Quarry DalrunzionErection of 3 wind turbines    
Ref. No: 14/01120/FLLLand 200 Metres North West Of Pairney Farm AuchterarderErection of wind turbine   Pending decision
Ref. No: 14/00837/FLLKnowes Farm Dunning Perth PH2 0RBErection of 9 no, turbines and associated infrastructure   Pending consideration
Ref. No: 14/00627/FLLLand 650 Metres North West Of Innernyte Farm KinclavenErection of wind turbine and associated infrastructure   Pending decision
Ref. No: 14/00478/FLLDrummick Farm Glenalmond Perth PH1 3SFInstallation of 2no wind turbines   Application approved
Ref. No: 14/00468/FLLColliston Farm Drunzie Glenfarg Perth PH2 9PEErection of a wind turbine and ancillary infrastructure   Pending decision
Ref. No: 14/00350/FLLLand North West Of Easter Fordel Farm GlenfargReplacement of wind turbine (hub height 20m approx) with a wind turbine (hub height 35m approx)   Pending consideration
Ref. No: 14/00253/SCRNDrummick Farm Glenalmond Perth PH1 3SFErection of 2 wind turbines    
Ref. No: 14/00097/FLMBandirran Wind Farm BalbeggieErection of 6 wind turbines, anemometer mast and ancillary works   Pending consideration
Ref. No: 13/02362/FLMCreag A' Bhaird Wind Farm AmulreeErection of 13 wind turbines and associated works and erection of two anemometer masts   Pending consideration
Ref. No: 13/02357/FLLLand 800 Metres South East Of Montague Mill House BalbeggieErection of a wind turbine, siting of ancillary infrastructure and formation of access track and hardstanding area   Pending consideration
Ref. No: 13/02356/FLLOutfield Farm Abernyte Perth PH14 9RAInstallation of a wind turbine (to replace turbine previously approved under Ref 11/00372/FLL)   Application approved
Ref. No: 13/02140/FLLLand 150 Metres North West Of Netheraird Of Glasclunie KinlochErection of wind turbine   Pending decision
Ref. No: 13/02021/SCRNLand 250 Metres North West Of Craigieholm BurreltonErection of a single wind turbine    
Ref. No: 13/01902/SCRNDrumfork BlacklunansErection of 500 kW wind turbine    
Ref. No: 13/01900/FLLHilton Of Aldie Aldie Kinross KY13 0QJErection of two wind turbines   Application approved
Ref. No: 13/01896/FLLLand 390 Metres South East Of The Bothy NewburghErection of a wind turbine   Pending decision
Ref. No: 13/01803/FLLCraiglaw Farm Rumbling Bridge Kinross KY13 0QQErection of two wind turbines associated plant and access track.   Application approved
Ref. No: 13/01467/SCRNMill Of Montague Balbeggie Balbeggie Perth PH2 7PRErection of a wind turbine    
Ref. No: 13/01449/SCRNStrelitz Pendagle Burrelton Blairgowrie PH13 9PYErection of a wind turbine    
Ref. No: 13/01367/SCRNLand 460 Metres South West Of Rossie Ochil Home Farm ForgandennyScreening opinion for 400kw wind turbine and associated ancillary structures on land    
Ref. No: 13/01325/SCRNShire-End Farm Path Of Condie Perth PH2 9DRProposed single medium-scaled wind turbine    
Ref. No: 13/01288/FLLLand 400 Metres South West Of Drumside DunningErection of a single wind turbine with temporary access track and substation   Application approved
Ref. No: 13/01230/FLLLand 700 Metres South Of Glenbran Farm AbernyteErection of wind turbine and ancillary works   Application approved
Ref. No: 13/01125/SCRNBalado Bridge Poultry Farm BaladoErection of wind turbine    
Ref. No: 13/00921/SCRNLand 570 Metres North West Of Craigmiglo Cottage MilnathortErection of wind turbine    
Ref. No: 13/00922/SCRNOld Fargie Farm Glenfarg Perth PH2 9QFErection of wind turbine    
Ref. No: 13/00889/SCRNMeikle Fieldie Glenfarg Perth PH2 9PZErection of a wind turbine    
Ref. No: 13/00798/FLLLand 350 Metres South West Of Wester Essendy Farm Wester EssendyErection of two wind turbines2320.06Application approved
Ref. No: 13/00766/SCRNCarden Farm Aldie Kinross KY13 0QHScreening Opinion - Erection of two wind turbines    
Ref. No: 13/00767/SCRNSouth Kilduff Wind Farm FossowayScreening Opinion - Erection of two wind turbines    
Ref. No: 13/00768/SCRNCraiglaw Farm Rumbling Bridge Kinross KY13 0QQScreening Opinion - Erection of two wind turbines    
Ref. No: 13/00715/SCRNNetheraird Of Glasclune Kinloch Blairgowrie PH10 6SFErection of wind turbine    
Ref. No: 13/00693/FLLLand 1200 Metres South East Of The House On The Hill KettinsInstallation of a wind turbine and associated infrastructure   Application approved
Ref. No: 13/00575/SCRNGourdie Farm Spittalfield Perth PH1 4LFErection of wind turbine1800.8Screening
Ref. No: 13/00576/SCRNCoupar Grange House Bendochy Blairgowrie PH13 9HTErection of single wind turbine   Screening
Ref. No: 13/00414/FLLLand 500 Metres North West Of East Blair Farm GlenfargErection of a single wind turbine2640.5Application approved
Ref. No: 13/00391/SCRNNetherton Farm Blackford Auchterarder PH4 1QUErection of 2 wind turbines   Screening
Ref. No: 13/00297/SCRNLand At Kinvaird (1km NW Of Moneydie And 3.4km West Of Luncarty)Erection of a wind turbine   Screening
Ref. No: 13/00272/SCRNLand 1200 Metres South East Of The House On The Hill KettinsErection of second wind turbine1460.25Screening
Ref. No: 13/00220/FLLLand At Easter Logie FornethErection of a wind turbine and associated infrastructure1490.1Pending consideration
Ref. No: 13/00162/SCRNLand 400 Metres South West Of Drumside DunningErection of a wind turbine149.50.225Screening
Ref. No: 13/00063/SCRNLand North West Of Easter Fordel Farm GlenfargInstallation of wind turbine1990.8Screening
Ref. No: 12/02200/FLLLand 600 Metres North East Of Thorntonhill FossowayErection of a wind turbine145.50.225Application approved
Ref. No: 12/01336/FLLLoyal Farm Alyth Blairgowrie PH11 8JQErection of a wind turbine and associated access track and meter house1470.225Application approved
Ref. No: 12/01934/FLLThe Corb Bridge Of Cally Blairgowrie PH10 7JXErection of a wind turbine, meter house and associated access track1840.85Application approved
Ref. No: 12/01544/FLLWilliamfield Greenloaning Dunblane FK15 0NAErection of a wind turbine1450.4Application approved
Ref. No: 12/01504/FLLEast Gormack Farm BlairgowrieModification of existing consent 10/01825/FLL to erect a wind turbine (change of model and increase in height)   Application approved
Ref. No: 12/01368/FLLLand To The North Of Tormaukin Grazings GlendevonErection of a wind turbine   Application approved
Ref. No: 12/01301/FLLVane Farm Nature Centre Kinross KY13 9LXErection of a wind turbine   Application approved
Ref. No: 12/01283/FLLLand 300 Metres North West Of Chapelhill Trinity GaskErection of a dwellinghouse and wind turbine   Application approved
Ref. No: 12/01082/FLLDunduff House Braco Dunblane FK15 9LAErection of two wind turbines (modification of 11/01692/FLL)   Application approved
Ref. No: 12/01021/FLLLand North West Of Easter Fordel Farm GlenfargErection of a wind turbine   Application approved
Ref. No: 12/00857/FLLLand 1200 Metres South East Of The House On The Hill KettinsErection of a wind turbine145.50.4Application approved
Ref. No: 12/00735/FLLMuirton Of Drumlochy Blairgowrie PH10 6TDErection of a wind turbine   Application approved
Ref. No: 12/00658/FLLLand 800 Metres South West Of Glenlomond Farm GlenlomondErection of 3 wind turbines   Application approved
Ref. No: 12/00321/FLLLand 140 Metres North East Of Ferns Cloquhat Bridge Of CallyErection of a wind turbine3842.4Application approved
Ref. No: 12/00245/FLLLand 2700 Metres North West Of Camsericht Lodge RannochErection of wind turbine   Application approved
Ref. No: 12/00233/FLLBarnhill Farm PowmillErection of a single wind turbine241.50.2 
Ref. No: 11/02152/FLLLand 300 Metres North West Of Wester Kinloch Farm Cottage KinlochErection of a wind turbine   Application approved
Ref. No: 11/02053/FLLBankhead Farm Fossoway Kinross KY13 0PWErection of two wind turbines2230.2Application approved
Ref. No: 11/01980/FLLLand 370 Metres West Of Hill Of Lethendy Farm Cottage MeikleourErection of a wind turbine and associated works   Application approved
Ref. No: 11/01930/FLLSite South Of The Upper And Lower Glendevon Reservoirs GlendevonWindfarm extension comprising two additional turbines and ancillary works21024Application approved
Ref. No: 11/01739/FLLCuthill Towers Farm Cuthill Towers Glenfarg Kinross KY13 9SHInstallation of a single wind turbine   Application approved
Ref. No: 11/01692/FLLDunduff House Braco Dunblane FK15 9LAErection of two wind turbines246.50.2Application approved
Ref. No: 11/01542/FLL7 Netherhall Steadings Milnathort Kinross KY13 0RLErection of a wind turbine to serve Plot 8   Application approved
Ref. No: 11/01500/FLLNether Obney Farm Bankfoot Perth PH1 4ATModification of existing consent (10/00515/FLL) Erection of two wind turbines   Application approved
Ref. No: 11/01470/FLLGellybank Farmhouse Kinross KY13 0LEErection of a wind turbine and formation of road entrance and driveway (Modification of consent 10/00124/FUL)   Application approved
Ref. No: 11/01464/FLLMid Cambushinnie Farm Cromlix Dunblane FK15 9JUErection of 2 wind turbines   Application approved
Ref. No: 11/01318/FLLShandry Farm Rait Perth PH2 7SFErection of two wind turbines and associated access track   Application approved
Ref. No: 11/01302/FLLLand At Hilton Hill Bamff Estate AlythInstallation of a wind turbine   Application approved
Ref. No: 11/01060/FLMCalliachar Wind Farm AmulreeVariation of previous consent (07/02617/FUL) to increase 14 wind turbine tower heights from 59m to up to 63.3m, rotor diameter from 82m to up to 93m and overall blade tip height from 100m to up to 109.8m14109.832.2Operational
Ref. No: 11/00798/FLLWoodhead Farm Blairgowrie PH10 6TBInstallation of a wind turbine   Application approved
Ref. No: 11/00766/FLLLand 2500 Metres South East Of Balmacnaughton RemonyErection of 2 wind turbines at Urlar Estate246.90.45Application approved
Ref. No: 11/00736/FLLMawcarse Farm Mawcarse Kinross KY13 9SJModification of existing consent (10/00235/FLL) to change turbine type and specification   Application approved
Ref. No: 11/00480/FLLThe Steading Wester Essendy PH10 6RAModification of existing consent 10/00276/FLL (Erection of 3 wind turbines)   Application approved
Ref. No: 11/00002/PSNLand 1200 Metres South East Of The House On The Hill KettinsErection of a single wind turbine up to 80m tip height   Application approved
Ref. No: 11/00394/FLLMuir O Lea Farm Crieff PH7 3RJErection of 2 wind turbines and associated meter housing   Application approved
Ref. No: 11/00372/FLLOutfield Farm Abernyte Perth PH14 9RAInstallation of a wind turbine   Application approved
Ref. No: 11/00251/FLLPlains Farm Path Of Condie Perth PH2 9QWErection of a wind turbine   Application approved
Ref. No: 11/00024/FLLEaster Tullyneddie Farm Forneth PH10 6SLInstallation of a 10kW Evoco wind turbine   Application approved
Ref. No: 11/00009/FLLEaster Fossoway Carnbo Kinross KY13 0PAErection of a wind turbine   Application approved
Ref. No: 10/02151/FLLMuirton Of Drumlochy Blairgowrie PH10 6TDErection of 10kW wind turbine   Application approved
Ref. No: 10/01919/FLLThorntonhill Fossoway KY13 0PBErection of 10kW evoco wind turbine   Application approved
Ref. No: 10/01904/FLLPairney Farm Auchterarder PH3 1DTErection of a wind turbine   Application approved
Ref. No: 10/01855/FLLBaldinnies Farm Dunning Perth PH2 0QQInstallation of 2 x 15kw wind turbines to generate electricity   Application approved
Ref. No: 10/01825/FLLEast Gormack Farm BlairgowrieErection of a wind turbine and associated development133.40.33Application approved
Ref. No: 10/01672/FLLStewart Tower Farm Airntully Stanley Perth PH1 4PJErection of a wind turbine166.60.33Application approved
Ref. No: 10/01601/FLLArnbog Farm Meigle Blairgowrie PH12 8QTErection of 3 wind turbines (19.33 metres in overall height)   Application approved
Ref. No: 10/01545/FLLGreenhead Farmhouse The Arnot Estate Leslie Glenrothes KY6 3JQErection of a 35 metre high wind turbine   Application approved
Ref. No: 10/01433/FLLStanley Farm Stanley Perth PH1 4PGInstallation of a 15kw wind turbine   Application approved
Ref. No: 10/01425/FLLSauchie Farm St Davids Madderty Crieff PH7 3PPInstallation of a 15kw wind turbine   Application approved
Ref. No: 10/01333/FLLColdrach Blacklunans Blairgowrie PH10 7LAErection of a 15m high wind turbine   Application approved
Ref. No: 10/01304/FLLGracefield St Martins Perth PH2 6AWErection of 11kw wind turbine   Application approved
Ref. No: 10/01271/FLLTouchie Farm Milnathort KY13 0RSErection of two wind turbines (modification of 08/00986/FUL; change of turbine type)   Application approved
Ref. No: 10/01001/FLLFlowerdale Farm Kinrossie Perth PH2 6HXInstallation of a wind turbine   Application approved
Ref. No: 10/00962/FLLThe Stables Donafuil Farm Coshieville Aberfeldy PH15 2LEErection of a wind turbine   Application approved
Ref. No: 10/00954/FLLConland Farm Glenfarg Perth PH2 9QGErection of a wind turbine   Application approved
Ref. No: 10/00876/FLLWelton Of Creuchies Farmhouse Alyth Blairgowrie PH11 8LBErection of four wind turbines, access road and associated infrastructure499.59.2Application approved
Ref. No: 10/00861/FLLGallowmyre House Pitroddie Perth PH2 7NUErection of a 6kw wind turbine   Application approved
Ref. No: 10/00789/FLLLand At The Stables LongforganModification of existing consent 09/02007/FLL - Erection of a wind turbine   Application approved
Ref. No: 10/00611/FLLTurflundie Abernethy Perth PH2 9LSErection of a two 11kw wind turbines   Application approved
Ref. No: 10/00515/FLL
Nether Obney Farm Bankfoot Perth PH1 4AT
Erection of two 15kw wind turbines
   Application approved
Ref. No: 10/00502/FLLCraighead Path Of Condie Perth PH2 9DRErection of 15kW wind turbine (hub height 15 metres)   Application approved
Ref. No: 10/00448/FLLEast Busby Farm Methven PH1 3SYErection of a wind turbine    
Ref. No: 10/00397/FLLMid Cambushinnie Farm Cromlix Dunblane FK15 9JUErection of 2 wind turbines   Application approved
Ref. No: 10/00276/FLLThe Steading Wester Essendy PH10 6RAErect 3 x 15kw wind turbines   Application approved
Ref. No: 10/00235/FLLMawcarse Farm Mawcarse Kinross KY13 9SJErection of a 15kw wind turbine   Application approved
Ref. No: 10/00178/FLLWest Haugh Kinclaven Perth PH1 4QRReplacement of wind turbine   Application approved
Ref. No: 10/00124/FLLGellybank Farm Kinross KY13 0LEErection of a wind turbine and formation of road entrance and driveway   Application approved
Ref. No: 10/00102/FLLIslabank Farm Meikleour Blairgowrie PH13 9HLErection of a wind turbine   Application approved
Ref. No: 09/02198/FLLBarnhill Farm Powmill Dollar FK14 7NSErection of 3 x 15kw wind turbines   Application approved
Ref. No: 09/02158/FLLDrumcairnie Main Road Aberuthven Auchterarder PH3 1HEErection of a 15kw wind turbine   Application approved
Ref. No: 09/02078/FLLCarsefoot Drum Kinross KY13 0PPErection of a 15kw wind turbine   Application approved
Ref. No: 09/02060/FLLLedlation Farm Milnathort KY13 0RSErection of 4 x 15kw wind turbines   Application approved
Ref. No: 09/02052/FLLBraco Castle Danduff House Braco Dunblane FK15 9LAErection of four wind turbines   Application approved
Ref. No: 09/02007/FLLLand At The Stables LongforganErection of a single 15kw wind turbine.   Application approved
Ref. No: 09/01795/FLLAbbey Farm Madderty Crieff PH7 3PAErection of a 15m high wind turbine   Application approved
Ref. No: 09/01655/FLLLand 620 Metres North West Of Crofthead BracoErection of 2 wind turbines   Application approved
Ref. No: 09/01534/FLLNivingston House CleishErection of a wind turbine   Application approved
Ref. No: 09/01418/FLLAim Development Inchcape House Inchcape Place Perth PH1 3DUErection of vertical axis wind turbine   Application approved
Ref. No: 09/01297/FLLSite At Oakbank Mill Lade Keithbank Weir BlairgowrieInstallation of small hydro electric turbine generator within the existing Lade   Application approved
Ref. No: 09/01295/FLLThe Old Crossing House Balgowan Tibbermore Perth PH1 1QWDemolition, alterations and extensions to house, erect new stone boundary walls and wind turbine   Application approved
Ref. No: 09/01213/FLLEast Busby Farm Methven PH1 3SYErection of a wind turbine   Application approved
Ref. No: 09/01149/FLLBalneathal Farmhouse Easter Balgedie Kinross KY13 9HQErection of a 15kw wind turbine   Application approved
Ref. No: 09/01130/FLLEast Fordel Farm Glenfarg Perth PH2 9QQErection of a wind turbine   Application approved
Ref. No: 09/01057/FLLScottish Hydro Electric Plc Ruthvenfield Way Inveralmond Industrial Estate Perth PH1 3UFInstallation of solar panels and erection of a wind turbine   Application approved
Ref. No: 09/01006/FLLHilton Of Duncrievie Duncrievie Glenfarg Perth PH2 9PDErection of a wind turbine   Application approved
Ref. No: 09/00861/FULZwetsloot Old Schoolhouse Thorngreen Road Kinrossie Perth PH2 6HPRemoval of existing and erection of a new wind turbine on land at   Application approved
Ref. No: 09/00828/MODCarsefoot Drum Kinross KY13 0PPModification of existing consent (09/00175/FUL) relocation of a 15m monopole wind turbine   Application approved
Ref. No: 09/00835/FLLNewlands Farm House Milnathort KinrossErection of 3 wind turbines   Application approved
Ref. No: 09/00833/FLLNewlands Farm House Milnathort Kinross KY13 9SLErection of a wind turbine   Application approved
Ref. No: 09/00803/FULEast Busby Farm Methven PH1 3SYErection of wind turbine   Application approved
Ref. No: 09/00701/FULGlenvale Kinross KY13 9HGErection of a single 15kw wind turbine   Application approved
Ref. No: 09/00660/FLLNetherhall Farm Kinross KY13 0RLErection of wind turbine   Application approved
Ref. No: 09/00175/FULCarsefoot Drum Kinross KY13 0PPErection of a monopole wind turbine   Application approved
Ref. No: 09/00154/FULTesco Stores Ltd Crieff Road Perth PH1 2NRErection of 2 temporary micro wind turbines (for a period of 15 years)   Application approved
Ref. No: 08/02311/FULHoodshill Fossoway Kinross KY13 0PWErection of wind turbine   Application approved
Ref. No: 08/02191/FULBuchal Farm Alyth Blairgowrie PH11 8JSErection of a wind turbine   Application approved
Ref. No: 08/02158/FULBlairstruie House Glenfarg Perth PH2 9QQErection of a wind turbine   Application approved
Ref. No: 08/01907/FULEaster Gatherleys Dunning Perth PH2 0RDErection of small scale wind turbine with associated works   Application approved
Ref. No: 08/01800/FUKennels Cottage Abernyte Perth PH14 9SXErection of a wind turbine   Application approved
Ref. No: 08/01768/FULCoulshill Farm Auchterarder PH3 1PPInstallation of 48kw wind turbine   Application approved
Ref. No: 08/01753/FULWest Brackley Farm Kinross KY13 9LUErection of a wind turbine   Application approved
Ref. No: 08/01651/FULTurret Water Treatment Works CrieffErection of a turbine and chemical dosing building   Application approved
Ref. No: 08/01627/FULQuilts Farm Dunning Perth PH2 0RBAlterations and extension to dwellinghouse/stable and erection of domestic wind turbine   Application approved
Ref. No: 08/01424/MODWoodend Cottage Forgandenny Perth PH2 9ESModification of existing consent (01/00805/MOD) change of house type and erection of garage/workshop and 15m wind turbine   Application approved
Ref. No: 08/01422/FULPitmeadow Farm Dunning Perth PH2 0RAErection of wind turbine on 15 metre mast   Application approved
Ref. No: 08/01334/FULFormer Steading Head Dyke AuchterarderErection of wind turbine   Application approved
Ref. No: 08/00986/FULTouchie Farm Kinross KY13 0RSErection of 2 micro wind turbines   Application approved
Ref. No: 08/00533/FULStronachie House Forgandenny Perth PH2 9DWInstallation of a 12m wind turbine   Application approved
Ref. No: 07/02468/FULFairfield Duncrievie Glenfarg Perth PH2 9PDErection of a wind turbine and solar panels   Application approved
Ref. No: 07/01981/FULAuchtergaven Manse Tulliebelton Road Bankfoot Perth PH1 4BSErection two wind turbines   Application approved
Ref. No: 07/01751/FULTesco Stores Ltd Edinburgh Road Perth PH2 8DXErection of a 10.6m high micro wind turbine (6kw) for 15 years   Application approved
Ref. No: 07/01537/FULDownham Farm Coupar Angus Blairgowrie PH13 9EYProposed conversion of farm workshop and store into dwellinghouse with associated garden, garages and wind turbine   Application approved
Ref. No: 07/00695/FULKaimes Cottage Braco Dunblane FK15 9LGErection of a 12m wind turbine   Application approved
Ref. No: 07/00273/FULBlackcraig Farm Cottage Perth PH2 7PJErection of a wind turbine   Application approved
Ref. No: 07/00023/FULOrmiston Wester Essendy Blairgowrie PH10 6RDInstallation of a micro wind turbine and formation of a vehicular access   Application approved
Ref. No: 06/02710/FULWhitehills Farm Blackford PH4 1RQFitting of wind turbine on apex of garage roof   Application approved
Ref. No: 06/02662/FULAuchloy Farm Crieff PH7 3NGDemolition of existing farmhouse and part of steading and erection of a replacement dwellinghouse and wind turbine   Application approved
Ref. No: 06/02630/FULBallintuim Strathtummel PH16 5RSErection of a free standing domestic wind turbine   Application approved
Ref. No: 06/02506/FULSummerfield Glenfarg Perth PH2 9QDErection of a domestic wind turbine   Application approved
Ref. No: 06/02283/FULBrackenbrae Aberargie Perth PH2 9NEErection of a wind turbine   Application approved
Ref. No: 06/01940/FULTullybelton House Bankfoot Perth PH1 4DHErection of new 25m high 50kw wind turbine   Application approved
Ref. No: 06/01837/FULTurflundie Abernethy Perth PH2 9LSErection of wind turbine on a 9m self-supporting mast (Proven Energy 6kw)   Application approved
Ref. No: 06/01399/FULSite A Dunsinnan Road Wolfhill PerthInstallation of a wind turbine   Application approved
Ref. No: 05/02407/FULVillage Hall Hall Road Guildtown PerthErection of a micro wind turbine   Application approved
Ref. No: 05/02328/FULShenavail Camserney Aberfeldy Perthshire PH15 2JFErection of a domestic wind turbine   Application approved
Ref. No: 05/02304/FULWest Third Radio Mast Site Braco Dunblane PerthshireInstallation of shift wind turbine   Application approved
Ref. No: 05/01407/FULLand At Douranside Milnathort Kinross KY13 0RPErection of a wind turbine to provide electricity to dwellinghouse   Application approved
Ref. No: 05/01142/FULKercock Farm Stanley Perth PH1 4QRErection of wind turbine at proposed new dwellinghouse (05/00269/FUL)   Application approved
Ref. No: 05/01061/FULLand At Green Knowes By GlendevonErection of 18 wind turbines and associated infrastructure, including borrow pits, control building, met mast, access tracks, access to A823 and temporary laydown areas189336Operational
Ref. No: 05/00752/FULLochelbank 129116Operational
Ref. No: 05/00689/FULDunskiag Aberfeldy Perthshire PH15 2EXInstallation of a wind turbine on a 15m tower   Application approved
Ref. No: 05/00404/FUL200 Dunkeld Road Perth PH1 3GHErection of a wind turbine   Application approved
Ref. No: 05/00396/FULThe Cottage At Inveralmond House 200 Dunkeld Road Perth PH1 3AQErection of a wind turbine   Application approved
Ref. No: 05/00395/FULCentral Stores Scottish Hydro Electric Plc Ruthvenfield Way Inveralmond Industrial Estate Perth PH1 3UFErection of a wind turbine   Application approved
Ref. No: 05/00394/FULInveralmond House Scottish Hydro Electric Plc Dunkeld Road Perth PH1 3GBErection of a wind turbine   Application approved
Ref. No: 04/02590/FULLand West Of Hilton Of Duncrieve Glenfarg PerthErection of a wind turbine   Application approved
Ref. No 04/0004/WINDGriffin 68124156Operational
Ref.No:03/01917/FULDrumderg 1610832Operational
Ref. No: 03/01729/FULZwetsloot Flower Wholesaler Thorngreen Road Kinrossie PerthErection of a 15m high wind turbine   Application approved
Ref. No: 02/00089/MODPond Cottage, Hattonburn Milnathort KinrossModification of existing consent to erect 10m mast for wind turbine for electricity generation at   Application approved
Ref. No: 00/00482/FULLangside Braco Dunblane Perthshire FK15 9LNAlterations to house and erection of double garage and wind turbine at   Application approved
Ref. No: 99/00108/FULDruimantavore Steading Crieff Perthshire PH7 4JRErection of a Proven Wind Turbine at   Application approved

 

Hydro schemes

Search the online database of hydro planning applications for hydro schemes or view applications below:

ProposalLocationDeveloperInstalled capacity (MW)Status
Ardtalnaig (opens new window)ArdtalnaigAchomer Energy1.7Awaiting decision
Riemore Estate (opens new window)ButterstoneBuckny Hydro-Withdrawn
Shian Burn (opens new window)AmulreeGarrows Farm0.08Withdrawn
Ballbeg Farm (opens new window)LawersP McDiarmid and Co0.1Approved
Invervar (opens new window)GlenlyonGreen Highland Renewables-Amended application
Remony (opens new window)AberfeldyAchard Hydro0.45Awaiting construction
Lick (opens new window)FossFrenich Hydro0.63Awaiting construction
Allt Meurain (opens new window)Glen LyonGlen Meran Farming0.80Awaiting decision
Eas Eoghannan (opens new window)Glen LyonGlen Meran Farming0.80Awaiting decision
Allt Lairig Nan Lunn (opens new window)Glen LyonLubreoch Farming0.80Awaiting decision
Dowally Burn (opens new window)DowallyBlair Castle Estate0.50Under construction
Banvie Burn (opens new window)Blair AthollBlair Castle Estate0.50Under construction
Loch Broom (opens new window)BallinluigBlair Castle Estate0.50Under construction
Mill of Keithick (opens new window)Coupar AngusKeithick Farms0.034Awaiting construction
Glenfernate (opens new window)EnochdhuGlenfernate Farm Partnership0.075Awaiting construction
Fealar Lodge (opens new window)EnochdhuFearlar Grazings0.05Awaiting construction
Oakbank Mill (opens new window)BlairgowrieBlairgowrie & Rattray Regeneration Company0.05Awaiting construction
Alt-Da-Ghob-Burn (opens new window)GlenlyonCA Ramsay Partnership0.60Approved
Roroyere (opens new window)GlenlyonGreen Highland Renewables0.75Approved
West of Roromore (opens new window)GlenlyonIngleby 451 Ltd0.95Approved
Camusvrachan (opens new window)GlenlyonCamusvrachan Hydro0.75Approved
Urlar (opens new window)AberfeldyUrlar Estate0.985Approved
Inverinain (opens new window)GlenlyonCA Ramsay Partnership0.85Approved
Innerwick Burn (opens new window)GlenlyonInnerwick Hydro1.00Approved
Kinnarird Burn (opens new window)PitlochryOld Faskally Farming Company0.25Approved
River Braan (opens new window)Dunkeldnpower3.40-
Innerhadden Estate (opens new window)Kinloch RannochInnerhadden Hydro Ltd1.40Approved
Keltneyburn (opens new window)AberfeldyKeltneyburn Hydro Ltd2.20Approved
Allt A' Bhealaich (opens new window)AberfeldyBolfracks Estate0.85Approved
Falls of Camserney (opens new window)CamserneyCamserney Hydro Scheme Ltd1.20Operational

Beauly to Denny transmission line

When completed, the project will replace the existing transmission line with fewer but taller pylons; this is intended to facilitate the growth of the renewable energy sector in the north and west of Scotland by making it possible to feed the power generated into the wider National Grid. After a Public inquiry the Scottish Ministers approved the application and construction is now well under-way with completion expected in 2015.

Last modified on 27 March 2024

Share this page

Facebook icon Twitter icon email icon

Print

print icon